Contract For Linter Work Without Material (Price/Square Foot)

180.00

Description

Sr No Construction Articles Description Labor Cost (in Rs)/

Sq-Foot

Size
1 Construction Lenter+Plaster(Inner Side of House Wall)+Raw(Kachcha) Floor>(For tiling Etc Purpose+ Bricklaying(Chunai)+gumati+

Stairs(note-front Design Prices Are Excluded)+ Pillar+bottom Beam(note-the Rent of MOULD Farma would be bear by owner not by company

Note-: If we are constructing basement than We will Consider basement as Base Floor

+15rs Will add subsequently On every Floor

180 N/A
2 Stairs Complete 270

Note-1.5x of Sr no 1

N/A
3 Roof

 

Bathroom, toilet,taand,almirah or etc)

Note-If Any Roof will be under the major roof consider under this Price

90

Note-0.5x of Sr no 1

N/A
4 Latrine Tank 1-Depth Should not  be More than 6 feet

 

2-if More than 6 feet

270

Note-1.5x of Sr no 1

2×180=360  of Sr no 1

N/A
5 Slips Slips Like Front Gate and Etc

It can be Consider or not

90

Note-0.5x of Sr no 1

N/A
6 Water Tank Over Major Roof 290

Note-1.5x of Sr no 1

N/A

Note-Minimum Are Should be 540 Sq/foot

  1. -We will Provide 6 month Warranty of Construction Work
  2. we will provide Free of Cost Map or layout or elevation of your According to Your Vaastu
  3. Our Engineer Will Visit Your Site Frequently
  4. We will Advice you how to Get Approval From your Respected Development authority
  5. bound to finish Your Work At committed Time and date
  6. our Contractor, Rajmistri, engineer and Site Supervisor are more than 5 years Experience holder

Additional information

price per foot

price per foot

Reviews

There are no reviews yet.

Be the first to review “Contract For Linter Work Without Material (Price/Square Foot)”

Your email address will not be published. Required fields are marked *